More work was done on the inside ahead of launch in the near future (date to be confirmed). The inside is being kept as a surprise for now, and pictures will be available at launch. It's looking great though!
On the outside, the signage arrived (fan designed), and put up, some mastic applied, plus some alterations to the door grille to make it open wider.


In addition more work done on the club shop, carpet tiling complete, locks updated etc..
On the pitch the water levels dropped, and the pitch is mostly clear now, with some water still around the sides at the far end, which should drain overnight based on past experience from the groundstaff.
A quick view around the ground.

Far end, Wellingborough Lake clearing up.

Far end other side, water off the main pitch now.

Terrace end, first of the new signage put up over weekend.

Advertising boards on the side, put up today

Main stand look left.

Main stand look right.